The plant has experienced the following benefits as a result of this modern control system upgrade project:
•Improved security, reliability, and availability
•Reduced outage duration and upgrade costs through pre-engineered EX2100e DFE packages
•Greater data availability through improved hardware and software Toolbox functionality
•Enhanced operational modes and alarm management
•Increased availability of spare parts and better protective functions